ACCA PM Throughput Accounting Notes: Theory of Constraints [Worked Examples]

ACCA PM throughput accounting notes: theory of constraints, bottleneck machine, TPAR above 1 and return per factory hour

In short, ACCA PM throughput accounting is a short-run method that ranks products by throughput per bottleneck hour. The bottleneck hour decides which product comes first, and the plan that earns the most throughput makes the most profit.

In fact, PM is a three-hour, 100-mark exam: Section A 30 marks, Section B 30 marks, Section C 40 marks. The pass mark is 50 percent. However, in September 2026, the pass rate was 42 percent, the lowest of the five Applied Skills papers. Finally, the next PM exam is Wednesday 9 December 2026, and results will be released on 18 January.

Open the ACCA notes hub.

ACCA PM Throughput Accounting: What It Is and Why It Matters

ACCA PM throughput accounting treats labor and overhead as fixed in the short run and ranks products by return per factory hour. Throughput equals selling price less direct material cost. A TPAR above 1 means the product earns cash faster than the factory spends it.

In other words, the aim is to earn more from sales while keeping stock and day-to-day running costs down. Specifically, throughput is the money coming in from sales, measured over time, not the value of goods produced. Inventory is the money tied up in goods for sale, and operational expense is the day-to-day cash spent on running the factory and turning stock into sales.

A bottleneck is the slowest step, and it sets the pace. For example, ACCA explains it with a hiking group: the slowest walker sets the pace. As a result, every hour the bottleneck stands idle is an hour of output the whole factory can never get back. In contrast, time saved on a machine with spare capacity adds nothing to output: it saves nothing for the system.

In particular, throughput accounting sits in syllabus Section B4, at level 2 (B4a theory of constraints, B4b TPAR, B4c TPAR improvement, B4d multiproduct decisions). A 20-mark Section C question on this topic is unlikely: one Section C question comes from Section E, the other from Section C and/or D. Therefore, expect it in Sections A and B, or in a Section C decision question.

ACCA PM Throughput Accounting Formulas and Ratios

Four formulas cover this topic.

MeasureFormula
Throughput per unitSelling price less direct material cost
Return per factory hourThroughput per unit / bottleneck hours per unit
Cost per factory hourTotal factory costs / total bottleneck hours available
TPARReturn per factory hour / cost per factory hour

See the lead above for a TPAR above 1. In contrast, below 1, the product does not cover its factory costs, so raise the price, cut material cost or bottleneck time, or cut factory costs.

For example, one specimen question gives a TPAR of 1.33. Return per factory hour is ($130-$50)/4 = $20, and cost per factory hour is ($40+$20)/4 = $15. Consequently, that $15 is a per-unit shortcut check on the definition above, so TPAR is $20/$15 = 1.33.

In fact, ranking by return per factory hour gives the same order as TPAR for products made in the same factory. Use TPAR for interpretation, and return per factory hour for ranking.

The five focusing steps

  • Identify the bottleneck (Step 1): compare time needed with time available at each step.
  • Exploit the bottleneck (Step 2): keep it running; cut idle time.
  • Subordinate everything else (Step 3): let the bottleneck set the schedule: accept idle time on non-bottlenecks.
  • Elevate the bottleneck (Step 4): raise its capacity, usually with capital spending, but only after exploitation.
  • Repeat the cycle (Step 5): go back to Step 1: do not let inertia become the bottleneck.

ACCA PM Throughput Accounting Worked Example 1: TPAR Ranking and the Optimal Plan

For example, one bottleneck machine has 1,000 hours per month, and total factory costs are $30,000 per month. Product A: $100 price, $40 material, 2 bottleneck hours per unit, demand 300 units. For Product B: $90 price, $30 material, 1 bottleneck hour per unit, demand 400 units.

ProductThroughput per unitReturn per factory hourTPAR
Product A$60 ($100-$40)$30 ($60/2)1.00 ($30/$30)
Product B$60 ($90-$30)$60 ($60/1)2.00 ($60/$30)

First, cost per factory hour is $30,000/1,000 hours = $30 per hour. Product B ranks first (TPAR 2.00), Product A second (1.00). Both earn $60 throughput per unit. Finally, return per factory hour breaks the tie.

Make B first: 400 x 1 = 400 hours. As a result, remaining hours are 1,000 – 400 = 600. A uses them: 600/2 = 300 units, full demand. Total throughput = (400 x $60) + (300 x $60) = $24,000 + $18,000 = $42,000. Consequently, profit = $42,000 – $30,000 = $12,000. A has a TPAR of exactly 1.00, so it only covers factory costs.

ACCA PM Throughput Accounting Worked Example 2: Accept or Reject and Make or Buy

Product C: $120 price, $50 material, 3 bottleneck hours per unit. Bottleneck capacity is 900 hours per month, fully used. For example, a customer offers a one-off order for 150 units of Product D at $150 per unit. Product D: $70 material, 2 bottleneck hours per unit; it displaces Product C.

ProductThroughput per unitReturn per factory hour
Product C$70 ($120-$50)$23.33 ($70/3)
Product D$80 ($150-$70)$40.00 ($80/2)

Product D earns $40.00 per bottleneck hour, Product C $23.33. Subsequently, the order uses 150 x 2 = 300 hours, and displaces 300/3 = 100 units of C. Throughput gained is 150 x $80 = $12,000. Throughput lost is 100 x $70 = $7,000. Therefore, net gain is $12,000 – $7,000 = $5,000, so accept the order.

Make-or-buy extension

An outside supplier offers the component at $95 per unit. In-house, it uses $50 of direct material and 3 bottleneck hours per unit. For instance, assume buying frees the hours for Product C work. Extra cost is $95-$50 = $45 per unit. Throughput from the freed hours is 3 hours at Product C return of $70/3 per hour = $70 per unit. In short, net benefit is $70-$45 = $25 per unit. Buy, if the freed hours can be used.

ACCA PM Throughput Accounting Worked Example 3: Throughput Versus Contribution

For example, one bottleneck machine has 500 hours, and factory costs of $25,000 are fixed in the short run. Product X: $200 price, $60 material, $80 labor, $20 variable overhead, 2 bottleneck hours per unit, demand 200 units. Product Y: $180 price, $40 material, $10 labor, $10 variable overhead, 4 bottleneck hours per unit, demand 100 units. For the contribution method, see the ACCA PM relevant costing notes.

ProductContribution per unitContribution per hourThroughput per unitReturn per factory hour
Product X$40 ($200-$60-$80-$20)$20.00 ($40/2)$140 ($200-$60)$70.00 ($140/2)
Product Y$120 ($180-$40-$10-$10)$30.00 ($120/4)$140 ($180-$40)$35.00 ($140/4)

Contribution per hour puts Y first ($30.00), X second ($20.00). Return per factory hour puts X first ($70.00), Y second ($35.00).

Contribution plan, Y first: 100 x 4 = 400 hours. As a result, remaining 100 hours give 100/2 = 50 units of X. Throughput = (100 x $140) + (50 x $140) = $14,000 + $7,000 = $21,000. Contribution = (100 x $120) + (50 x $40) = $12,000 + $2,000 = $14,000. Therefore, profit = $21,000 – $25,000 = a loss of $4,000.

Throughput plan, X first: 200 x 2 = 400 hours. Subsequently, remaining 100 hours give 100/4 = 25 units of Y. Throughput = (200 x $140) + (25 x $140) = $28,000 + $3,500 = $31,500. Contribution = (200 x $40) + (25 x $120) = $8,000 + $3,000 = $11,000. Therefore, profit = $31,500 – $25,000 = $6,500.

In contrast, the contribution plan looks better on contribution ($14,000 versus $11,000) but loses $4,000, while the throughput plan earns $6,500: a difference of $10,500. Contribution ranking misleads because it deducts labor as if variable. Profit is throughput less factory costs.

ACCA PM Throughput Accounting Exam Traps

  • Wrong bottleneck test. For example, maximum output is total hours divided by time per unit. Do not pick the stage with the fewest hours or the longest time per unit. In Illawarra Co, Stage 2 was the bottleneck (128 units).
  • Ranking by throughput per unit. In the ACCA article, product E looked best on throughput per unit, but product G ranked first per hour.
  • Deducting labor and overhead from price. Throughput is selling price less direct material cost only.
  • Wrong cost per factory hour. In particular, use total factory costs divided by total bottleneck hours available.
  • TPAR below 1, or TPAR above 1 as a profit guarantee. However, ACCA expects TPAR above 1, but low volumes can mean a loss.
  • Running non-bottlenecks at 100 percent. Non-bottleneck idle time is essential.
  • Elevating before exploiting. Exploitation comes first and costs little or nothing.
  • Elevating the wrong resource. In contrast, a non-bottleneck upgrade does not raise output. In Cat Co, only machine Z was the bottleneck.
  • Treating the five steps as a one-off project. Step 5 returns to Step 1, because a new bottleneck appears.
  • Using contribution ranking for a throughput question. In contrast, limiting factor analysis ranks by contribution per scarce unit; throughput ranks by return per bottleneck hour.

ACCA PM Throughput Accounting in One Page

  • Throughput: selling price less direct material cost.
  • Return per factory hour: throughput / bottleneck hours.
  • Cost per factory hour: total factory costs / bottleneck hours.
  • TPAR: return divided by cost; expect above 1.
  • In the first example: B comes first and A second; throughput $42,000, profit $12,000.
  • For the second example: accept D (+$5,000) and buy the component (+$25 per unit).
  • The third example: contribution plan -$4,000; throughput plan +$6,500; difference $10,500.
  • Five steps: identify, exploit, subordinate, elevate, repeat.
  • Traps: lowest maximum output finds the bottleneck; rank by return per hour.

In conclusion, ACCA PM throughput accounting rewards a clear method: find the bottleneck, rank by return per factory hour, and check the TPAR. Read the ACCA technical article, and find the rest of the set on the ACCA notes hub.