Some future costs belong on the balance sheet as provisions. Others belong only in the notes as disclosures. IAS 37 draws the line between the two. ACCA FR IAS 37 notes start from one rule: recognize a provision only when three tests all pass. First, a present obligation must exist because of a past event. Second, an outflow of resources must be probable, which means more likely than not. Third, the amount must be capable of reliable estimate. Start revision at the ACCA notes hub.
The paper is a three hour computer based exam worth 100 marks, with Sections A 30, B 30 and C 40. The pass mark is 50 percent. In September 2026, 49 percent of candidates passed FR, according to ACCA Global, down from 52 percent in June 2026. FR sits on Thursday 10 December 2026, with results due on Monday 18 January 2027. IAS 37 sits in syllabus area B.
ACCA FR IAS 37: the three recognition tests
Recognize a provision only when three tests all pass: a present obligation from a past event, a probable outflow of resources, and a reliable estimate of the amount. If any test fails, recognize nothing. Disclose a contingent liability instead, unless the chance of an outflow is remote.
The first test is the present obligation. It can be legal, from a contract or a law, or constructive, from past practice or a public statement that has created a valid expectation. What matters is the past event, called the obligating event. It must already have happened and leave no realistic alternative to settling. A plan to close a factory next year creates nothing today; a sale with a warranty does.
The second test is probability. IAS 37 defines probable as more likely than not, so a chance above 50 percent. A lawsuit with a 60 percent chance of losing passes this test. A lawsuit with a 30 percent chance does not, so disclose it instead.
The third test is a reliable estimate. IAS 37 states that except in extremely rare cases, a business will be able to determine a range of possible outcomes. It can then make an estimate that is reliable enough.
| Situation | Treatment |
|---|---|
| Present obligation, probable outflow, reliable estimate | Recognize a provision |
| Possible obligation, or outflow only possible | Disclose as a contingent liability |
| Present obligation, but outflow not probable or no reliable estimate | Disclose as a contingent liability |
| Possibility of outflow is remote | Disclose nothing |
ACCA FR IAS 37 measurement rules
Measure a provision at the best estimate of the cost to settle the obligation at the reporting date. That is the amount the business would rationally pay to settle it. Review provisions each reporting period and adjust them to the current best estimate. If an outflow is no longer probable, reverse the provision.
For a large population of similar items, such as warranties, the best estimate is the expected value, which weights every possible outcome by its probability. For a single obligation, such as one lawsuit, the individual most likely outcome may be the best estimate. Gains from the expected disposal of assets are never taken into account.
Where the time value of money is material, discount the provision to present value. Use a pre-tax rate reflecting market assessments and the risks specific to the liability. Recognize the increase in the provision over time, as the discount unwinds, as a finance cost. Recognize a reimbursement as a separate asset only when it is virtually certain. It cannot exceed the provision.
ACCA FR IAS 37 worked example 1: warranty provision
Harbor Appliances sells 2,000 washing machines in the year, each with a one year warranty. Past experience: 75 percent need no repair, 20 percent a minor repair at $120, and 5 percent a major repair at $600. The sales have already happened, so all three tests pass. Recognize a provision.
Use expected value, because this is a large population. The expected cost per unit is 75 percent of $0, plus 20 percent of $120, plus 5 percent of $600. That gives $0 plus $24 plus $30, which is $54 per unit. For 2,000 units, the provision is 2,000 times $54, which is $108,000. Check: 400 at $120 is $48,000, and 100 at $600 is $60,000.
| Outcome | Probability | Cost per unit | Weighted cost |
|---|---|---|---|
| No repair | 75% | $0 | $0 |
| Minor repair | 20% | $120 | $24 |
| Major repair | 5% | $600 | $30 |
| Expected cost per unit | 100% | $54 |
Debit warranty expense $108,000, credit warranty provision $108,000. Charge repairs against the provision, not against profit or loss again. The common exam error is to use $0, the most likely single outcome. That is wrong for a population.
ACCA FR IAS 37 worked example 2: decommissioning provision
Meridian Energy installs an offshore platform on 1 January 2026. Its license requires dismantling and site restoration in 10 years, at an estimated cost of $500,000. The obligation exists from installation day, and settlement is 10 years away, so discount the provision.
At a pre-tax rate of 6 percent, present value is $500,000 divided by 1.06 to the power of 10, which is 1.7908477, giving $279,197.39. Recognize that amount as a provision and add it to the cost of the platform. Debit property, plant and equipment $279,197.39, credit decommissioning provision $279,197.39.
Two charges run each year. First, depreciation of $279,197.39 over 10 years, or $27,919.74 per year. Second, the discount unwinds. In Year 1, the unwinding is 6 percent of $279,197.39, which is $16,751.84, recognized as a finance cost. The provision at the end of Year 1 is therefore $279,197.39 plus $16,751.84, which is $295,949.23. The platform carrying amount at the end of Year 1 is $251,277.65.
Onerous contracts and restructuring
An onerous contract is one where the unavoidable costs of meeting it exceed the benefits expected from it. IAS 37 requires a provision at the lower of the cost of fulfilling the contract and the cost of terminating it, including any penalties. Take a contract earning $80,000 that costs $95,000 to fulfill, a loss of $15,000. If cancellation costs a $10,000 penalty, the provision is $10,000, the lower amount.
Restructuring has the strictest rule in IAS 37. Recognize a restructuring provision only when a constructive obligation exists. That needs a detailed formal plan and a valid expectation raised in those affected. Raise that expectation by starting to implement the plan or by announcing its main features to them. A board decision alone is never enough.
Include only direct costs necessarily entailed by the restructuring, not costs of ongoing activities. Include redundancy pay. Retraining staff who will stay, marketing a relaunched product and investing in new systems are all excluded. Recognize no provision for future operating losses, because there is no present obligation to incur them. No obligation arises for a sale until a binding sale agreement exists.
Contingent liabilities and contingent assets
A contingent liability is a possible obligation, confirmed only by future events outside the business. It can also be a present obligation that fails the tests because the outflow is not probable or no reliable estimate exists. Never recognize contingent liabilities on the balance sheet. Disclose them in the notes, unless the outflow is remote.
A contingent asset is the mirror image: a possible asset from past events, confirmed only by future events outside the business. Never recognize contingent assets either. Disclose a contingent asset in the notes when an inflow of economic benefits is probable. When realization becomes virtually certain, recognize the asset in full.
ACCA FR IAS 37 exam traps
1. Future operating losses are never provisions. A forecast loss creates no present obligation, so recognize nothing.
2. A board decision alone creates no restructuring provision. Without a detailed formal plan and a valid expectation raised, there is no constructive obligation.
3. Never recognize contingent assets. Disclose when probable; recognize only when virtually certain.
4. Discount only when the effect is material. Do not discount a provision payable in a few months. Discount a cost payable in 10 years, and treat the unwinding as a finance cost.
5. Probable means more likely than not. A 60 percent chance of losing a lawsuit passes the recognition test, and a 40 percent chance does not.
6. A reimbursement is a separate asset, never a reduction of the provision. The provision stays at its full best estimate, and the reimbursement is shown separately.
7. Onerous contracts use the lower of two amounts. Compare the loss on fulfilling the contract with the cost of terminating it, and provide for the lower amount.
One-page revision box
ACCA FR IAS 37 in one page. Recognize a provision only when three tests all pass: present obligation from a past event, probable outflow (more likely than not, above 50 percent), reliable estimate. Measure at the best estimate, using expected value for a population. Discount when material at a pre-tax rate; treat the unwinding as a finance cost. Onerous contract: provide for the lower amount. Restructuring: formal plan plus valid expectation, direct costs only. Contingent liability: disclose unless remote. Contingent asset: disclose when probable, recognize when virtually certain. Exam: 3 hours, 100 marks, A 30, B 30, C 40, pass 50 percent. FR sits on Thursday 10 December 2026, results are due on Monday 18 January 2027, and the September 2026 pass rate was 49 percent.
Work through the two examples, then test yourself: decide provision, disclosure or nothing, and state which test drives the answer. For the full set, return to the ACCA notes hub.
Enjoying this? Add StudyFromNotes as a preferred source on Google to see our latest notes and updates more often:

Daniel Mercer is a finance writer focused on the ACCA and CPA exams, financial reporting, and career moves in accounting and finance. Daniel writes from the same syllabuses covered on this site and favors clear explanations, comparison tables, and practical checklists over theory alone. The beat covers exam technique, accounting standards in plain language, and how finance professionals plan their next role.